JSE - Safely installed scaffolding

Health and Safety is so important to us at JSE Scaffolding.  Our scaffolding is planned, designed, erected, and inspected with everyone’s safety in mind.

We follow the Health and Safety executive’s guidelines in all that we do.  We have advanced CISRS qualified scaffolders in-house and can carry out advanced CISRS scaffolding inspections (in addition to basic CISRS qualified scaffolders and inspections.)  And we have full comprehensive Public Liability insurance and will produce a method statement for each job that we erect. For more information, please do not hesitate to contact us via the phone numbers, or the enquiry form, on the Contact JSE page of this website.  Thank you!

JSE – because it’s not just our pieces of scaffolding, it’s YOUR peace of mind

JSE – Safely installed scaffolding -10 top safety tips for erecting and using scaffolding in the UK

1. Ensure all scaffolding is erected by trained and competent personnel.
2. Carry out a thorough risk assessment before commencing work.
3. Inspect the scaffolding daily and after any adverse weather conditions.
4. Use appropriate personal protective equipment (PPE) such as hard hats, safety harnesses, and non-slip footwear.
5. Secure all materials and tools to prevent them from falling.
6. Maintain a tidy and organised work area to minimise trip hazards.
7. Establish a safe system of access and egress, such as using ladders or stairways.
8. Avoid overloading the scaffolding and distribute the weight evenly.
9. Ensure the scaffolding is properly grounded and stabilised.
10. Provide adequate training and supervision for all workers using the scaffolding.